| Tender specification No. & Corrigendum (if any) | Date of opening | Issuing Authority | Particulars |
| 14/ECD(D)/L/ 11-12 | 04-05-11 | Executive Engineer | 33/11 के0वी0 विद्युत उपकेन्द्र आई0आई0एम0 रोड लखनऊ पर स्विचगियर कक्ष भवन का निर्माण एवं अन्य विविध जानपदीय कार्य। |
| 13/ECD(D)/L/ 11-12 | 03-05-11 |
Executive Engineer | (अनुसूचित जाति हेतु आरक्षित) माननीय मुख्य मंत्री जी द्वारा विभिन्न उपकेन्द्रों के लोकार्पण के शिलापटों को स्थापित करने का कार्य। |
| 12/ECD(D)/L/ 11-12 | 03-05-11 | Executive Engineer | 33/11 के0वी0 विद्युत उपकेन्द्र किन्दीपुर, जनपद, सुलतानपुर पर स्विचगियर कक्ष भवन का निर्माण एवं अन्य विविध जानपदीय कार्य। |
| T.No.01-CE(LZ)/11-12 | 10.05.2011 |
Chief Engineer, Lucknow Zone | Computerized Cash Collection Center in Urban Area |
| MEDCO/451/2011 | 23.04.2011 |
Chief Engineer (MM), MVVNL, Lucknow | SUPPLY OF 11 KV XLPE CABLE 3X70 SQ. MM. |
| MEDCO/450/2011 | 23.04.2011 |
Chief Engineer (MM), MVVNL, Lucknow | SUPPLY OF 11 KV XLPE CABLE 3X120 SQ. MM. |
| MEDCO/449/2011 | 21.04.2011 |
Chief Engineer (MM), MVVNL, Lucknow | SUPPLY OF 11 KV XLPE CABLE 3X185 SQ. MM. |
| MEDCO/447/2011 | 05.05.2011 at 15:00 Hrs |
Chief Engineer (MM), MVVNL, Lucknow | Repair work of 11/0.433 KV, 160 KVA, 250 KVA, 400 KVA, 630 KVA, 1000 KVA Burnt/ Damaged Copper Wound Distribution Transformers |
| MEDCO/446/2011 | 04.05.2011 at 15:00 Hrs. |
Chief Engineer (MM), MVVNL, Lucknow | Repair work of 11/0.433 KV, 25KVA, 63 KVA, 100 KVA, 160 KVA, 250 KVA Burnt/Damaged Alumunium Wound Distribution Transformers |
| Tender No.64/2010-11 | 8-4-2011 | S.E., EWC, DEWA ROAD, CHINHAT, LUCKNOW. | Construction of 33KV & 11KV Line for 33/11KV S/s Nepalapur, Distt. Sitapur. |
| Tender No.65/2010-11 | 8-4-2011 | S.E., EWC, DEWA ROAD, CHINHAT, LUCKNOW. | Construction of 1x5MVA 33/11KV S/s Kheri Town, Distt. Lakhimpur. |
| Tender No.66/2010-11 | 8-4-2011 | S.E., EWC, DEWA ROAD, CHINHAT, LUCKNOW. | Construction of 33KV & 11KV Line for 33/11KV S/s Kheri Town, Distt. Lakhimpur. |
| MEDCO/445/2011 | 15.04.2011 at 15:00 Hrs | Chief Engineer (MM), MVVNL, Lucknow | Supply of 33KV XLPE CABLE 3X300 SQ. MM. Qty. – 150 KM. |
| ESCL/19/2010 | 21.04.2011 | OFFICE OF THE SUPERINTENDING ENGINEER, ELECTRICITY STORE CIRCLE, B-21 ‘H’ ROAD, MAHANAGAR EXTN., LUCKNOW-226006 | TENDER DOCUMENTS FOR PROCUREMENT OF 11/0.4 KV 3 PHASE 63 KVA THREE STAR RATING ALUMINUM WOUND TRANSFORMER |
| Corrigendum of ESCL/18/2010 | 18.04.2011 | OFFICE OF THE SUPERINTENDING ENGINEER, ELECTRICITY STORE CIRCLE, B-21 ‘H’ ROAD, MAHANAGAR EXTN., LUCKNOW-226006 | TENDER DOCUMENTS FOR PROCUREMENT OF 11/0.4 KV 3 PHASE 25 KVA THREE STAR RATING ALUMINUM WOUND TRANSFORMER |
| ESCL/18/2010 | 18.04.2011 | OFFICE OF THE SUPERINTENDING ENGINEER, ELECTRICITY STORE CIRCLE, B-21 ‘H’ ROAD, MAHANAGAR EXTN., LUCKNOW-226006 | TENDER DOCUMENTS FOR PROCUREMENT OF 11/0.4 KV 3 PHASE 25 KVA THREE STAR RATING ALUMINUM WOUND TRANSFORMER |
| 76/ECD(D)/L/ 10-11 | 23-03-11 | Executive Engineer | इस कार्यालय की अल्पकालीन निविदा सूचना संख्या 13/2010-11 के अन्तर्गत निविदा विशिष्ट संख्या 76/विजाखं(वि0)/एल/2010-11 निविदा जो दिनांक 10-03-2011 को खुलनी थीं अपरिहार्य कारणों वश उक्त निविदा दिनांक 23-03-11 को खोली जायेंगी। अन्य शर्तें पूर्ववत रहेंगी। |
| ESCL/17/2010 | 22.03.2011 | OFFICE OF THE SUPERINTENDING ENGINEER, ELECTRICITY STORE CIRCLE, B-21 ‘H’ ROAD, MAHANAGAR EXTN., LUCKNOW-226006 | TENDER DOCUMENTS FOR PRINTING AND SUPPLY OF REVENUE RECEIPT BOOKS |
| 76/ECD(D)/L/ 10-11 | 10-03-11 | Executive Engineer | (अनुसूचित जाति हेतु आरक्षित) 33/11 के0वी0 विद्युत उपकेन्द्र कन्याणपुर पर नये स्विचगियर कक्ष भवन का निर्माण एवं अन्य विविध जानपदीय कार्य। |
| 77/ECD(D)/L/ 10-11 | 10-03-11 | Executive Engineer | 33/11 के0वी0 विद्युत उपकेन्द्र जी0टी0आई0 बासमण्डी चैराहा लखनऊ पर स्विचगियर कक्ष भवन में कोटा स्टोन लगाने व प्रथम एवं द्वितीय तल पर विविध जानपदीय कार्य। |
| MEDCO/441/2011 | o4.03.2011 At 14:00 Hrs | Chief Engineer (MM), MVVNL, Lucknow | APPOINTMENT OF AGENCIES FOR RECOVERY OF ARREARS IN EUDC–I, II, III & IV, LESA, LUCKNOW UNDER MVVNL. |
| MEDCO | 11.03.2011
At 15:00 Hrs सभी आवेदन वांछित सूचनाओं एवं प्रमाण पत्रों के साथ दिनांक 11.03.2011 एवं अवकाष की स्थिति में अगले कार्यदिवस अपरान्ह 3 बजे तक सम्बन्धित विद्युत वितरण मण्डल में जमा किये जायेगे तथा उसी दिन 4 बजे सम्बन्धित अधीक्षण अभियन्ता द्वारा खोला जायेगा। |
Chief Engineer (MM), MVVNL, Lucknow | मध्यांचल विद्युत वितरण निगम लि0 के अधीन ग्रामीण क्षेत्रों में कलेक्षन बेस्ड फ्रेन्चाइजी के चयन/नियुक्ति हेतु |
| MEDCO/442/2011 | 25.02.2011 at 15:30 Hrs. | Chief Engineer (MM), MVVNL, Lucknow | Work of Bill Printing and Accounting Work of
Certain Specified Categories of Electricity Consumers of MVVNL
through Computers for three years Period. (For Lucknow, Faizabad & Bareilly Distribution Zones & Two Electricity Distribution Divisions of LESA). |
| 69/ECD(D)/L/ 10-11 | 19-02-11 | Executive Engineer | माननीय मुख्य मंत्री की घोषणा के अन्तर्गत 33/11 के0वी0 विद्युत उपकेन्द्र राम की पैडी अयोध्या फैजाबाद पर क्षमता वृद्धि के जानपदीय कार्य। |
| 70/ECD(D)/L/ 10-11 | 19-02-11 | Executive Engineer | मुख्य अभियन्ता आवास फैजाबाद पर टाइलिंग का कार्य व जाली आदि लगाने का कार्य। |
| 71/ECD(D)/L/ 10-11 | 19-02-11 | Executive Engineer | (अनुसूचित जाति हेतु आरक्षित) कार्यालय अधीक्षण अभियन्ता विद्युत वितरण मण्डल फैजाबाद कार्यालय में अधीक्षण अभियन्ता कक्ष के साथ शौचालय के निर्माण कार्य। |
| 72/ECD(D)/L/ 10-11 | 19-02-11 | Executive Engineer | 33/11 के0वी0 विद्युत उपकेन्द्र नवाबगंज घोसियाना बाराबंकी के प्रथम तल पर कार्यालय हेतु कमरों का निर्माण कार्य। |
| 73/ECD(D)/L/ 10-11 | 19-02-11 | Executive Engineer | 33/11 के0वी0 विद्युत उपकेन्द्र खोराहंसा जनपद गोण्डा के स्विचयार्ड व स्विचगियर टाइल लगाने का कार्य। |
| 74/ECD(D)/L/ 10-11 | 19-02-11 | Executive Engineer | 33/11 के0वी0 विद्युत उपकेन्द्र विक्टोरिया पार्क चौक लखनऊ के स्विचगियर भवन व उपखण्ड अधिकारी कार्यालय की विशेष मरम्मत का कार्य। |
| 19-02-11 | Executive Engineer | मुख्य अभियन्ता आवास फैजाबाद पर अन्दर व बाहर रंगाई-पुताई का कार्य। | |
| MEDCO/441/2011 | 22.02.2011 At 14:00 Hrs | Chief Engineer (MM), MVVNL, Lucknow | APPOINTMENT OF AGENCIES FOR RECOVERY OF ARREARS IN EUDC–I, II, III & IV, LESA, LUCKNOW UNDER MVVNL. |
| MEDCO/440/2011 | 28.01.2011 at 15:00 Hrs. | Chief Engineer (MM), MVVNL, Lucknow | Supply of 11 KV Disc Insulators (T&C) 45 KN. |
| MEDCO/439/2011 | 04.02.2011 At 15:30 Hrs |
Chief Engineer (MM), MVVNL, Lucknow |
Supply of i) 33 KV 200/100/1-1-1 ii) 33 KV 400/200/1-1-1 |
| 48/2010-11 | 11-01-2011 |
S.E., EWC, DEWA ROAD, CHINHAT, LUCKNOW. |
Construction of 33KV & 11KV Line for 33/11KV S/s Kheri Town, Distt. Lakhimpur. |
| MEDCO/437/2010 | 07-01-2011 At 15:00 Hrs |
Chief Engineer (MM), MVVNL, Lucknow |
Supply of L.T. 2X2.5 SQ. MM. PVC Cable. |
| 68/ECD(D)/L/ 10-11 | 04-01-11 |
Executive Engineer | 33/11 के०वी० विद्युत उपकेन्द्र ला-प्लास, लखनऊ पर Barbed Wire फेन्सिंग लगाने का कार्य। |
| 67/ECD(D)/L/ 10-11 | 04-01-11 |
Executive Engineer | 33/11 के०वी० विद्युत उपकेन्द्र बटलर पैलेस, लखनऊ पर Barbed Wire फेन्सिंग लगाने का कार्य। |
| 66/ECD(D)/L/ 10-11 | 04-01-11 |
Executive Engineer | (अनुसूचित जाति हेतु आरक्षित)33/11 के०वी० विद्युत उपकेन्द्र कल्याणपुर, लखनऊ पर Barbed Wire फेन्सिंग लगाने का कार्य। |
| MEDCO/435/2010 | 11.01.2011 At 15:00 Hrs |
Chief Engineer (MM), MVVNL, Lucknow | Supply of AB Cable (3Cx95+1x70+1Cx16) sq.mm |
| MEDCO/434/2010 | 11.01.2011 At 14:00 Hrs |
Chief Engineer (MM), MVVNL, Lucknow | Supply of Fault Locating Machine (Semi Automatic) |
| Tender No.47/2010-11 | 11-1-2011 | S.E., EWC, DEWA ROAD, CHINHAT, LUCKNOW. | Construction of 33/11KV S/s Kheri Town, Distt. Lakhimpur |
| 98/E.U.D.C-III/2010-11 | 13.01.2011 | S.E., E.U.D.C-III, LESA, Lucknow |
Bifercation of Indralok feeder in the area of E.U.D.D-Kanpur Road, LESA, Lucknow Bifercation of Hind Nagar feeder in the area of E.U.D.D-Kanpur Road, LESA, Lucknow |
| 46/2010-11 | 21-12-2010 | S.E., EWC, DEWA ROAD, CHINHAT, LUCKNOW. | Construction of 33KV Line and 11KV Line for 33/11KV S/s Nepalapur, Distt. Sitapur. |
| 45/2010-11 | 21.12.2010 | Superintending Engineer, Electricity Works Circle, Madhyanchal Vidyut Vitran Nigam, U.P. Power Corporation Limited,Transmission Colony, Dewa Road, Chinhat, | Bill of Qty. against Tender No. 46/2010-11 for construction of 11 KV Line for 1x5 MVA 33/11 KV S/S Nepalapur, Distt. Sitapur |
| 46-2010-11 | 21.12.2010 | Superintending Engineer, Electricity Works Circle, Madhyanchal Vidyut Vitran Nigam, U.P. Power Corporation Limited,Transmission Colony, Dewa Road, Chinhat | Bill of Qty. against Tender No. 46/2010-11 for construction of 33 KV Line for 1x5 MVA 33/11 KV S/S Nepalapur, Distt. Sitapur |
| 94/E.U.D.C-III/2010-11 | 15.12.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Replacement of 11 K.V. old VCB/OCB at 33/11 K.V. Sub-Station New Rajajipuram-II in the area of E.U.D.D-Rajajipuram, LESA, Lucknow |
| MEDCO/433/2010 | 09.12.2010 At 15:00 Hrs | Chief Engineer (MM), MVVNL, Lucknow | SUPPLY OF L.T. 2X2.5 SQ. MM. PVC CABLE |
| (a) MEDCO/423/2010 | 07.12.2010 At 14:00 hrs. |
Chief Engineer (MM), MVVNL, Lucknow |
Supply of Single Phase L.T. Distribution box
suitable for various sizes of Single Phase Arial Bunched Cable |
| (b) Corrigendum For MEDCO/423/2010 | 07.12.2010 At 14:00 hrs. |
Chief Engineer (MM), MVVNL, Lucknow |
Supply of Single Phase L.T. Distribution box
suitable for various sizes of Single Phase Arial Bunched Cable |
| 88/E.U.D.C-III/2010-11 | 02.12.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Bifercation of 11 K.V. Mill Road & Shastri Nagar feeder in the area of E.U.D.D-Aishbagh, LESA, Lucknow |
| 87/E.U.D.C-III/2010-11 | 22.11.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Guarding of 11 K.V. feeder from 33/11 K.V. Sub-Station New Rajajipuram in the area of E.U.D.D-Rajajipuram, LESA, Lucknow. Construction of 11/0.4 K.V Sub-Station at Surkhibatiya Bazar in the area of E.U.D.D-Rajajipuram,LESA,Lucknow |
| 86/E.U.D.C-III/2010-11 | 22.11.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Laying of 11 K.V. Cable at 33/11 K.V. Sub-Station New Rajajipuram in the area of E.U.D.D-Rajajipuram, LESA, Lucknow |
| 85/E.U.D.C-III/2010-11 | 22.11.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Construction of 11/0.4 K.V. 2X250 KVA Sub-Station 11 K.V. overhead and undergroung line from 33 K.V. Sub-Station Indralok to Kesari Khera, Lucknow in the area of E.U.D.D-Kanpur Road, LESA, Lucknow |
| (a) MEDCO/428/2010 | 22.11.2010 at 14:00 Hrs. |
Chief Engineer (MM), MVVNL, Lucknow | Supply of Fault Locating Machine (Semi Automatic) |
| (b) MEDCO/428/2010 | 22.11.2010 at 14:00 Hrs. |
Chief Engineer (MM), MVVNL, Lucknow | Supply of Fault Locating Machine (Semi Automatic) |
| 19-CE (LZ)/Works/2010-11 | Part – I 23.11.2010 At 15:00 Hours | Chief Engineer, (Distribution), Lucknow Zone, MVVNL, Lucknow | Meter reading, bill generation, bill distribution, disconnection, Energy accounting and other related activities in Laharpur, Biswan, Mehmoodabad Town of Sitapur District. |
| 20-CE (LZ)/Works/2010-11 | Part – I 23.11.2010 At 15:00 Hours |
Chief Engineer, (Distribution), Lucknow Zone, MVVNL, Lucknow | Meter reading, bill generation, bill distribution, disconnection, Energy accounting and other related activities in Palia, Gola & Mohmedi Town of Lakhimpur District. |
| 21-CE (LZ)/Works/2010-11 | Part – I 23.11.2010 At 15:00 Hours |
Chief Engineer, (Distribution), Lucknow Zone, MVVNL, Lucknow | Meter reading, bill generation, bill distribution, disconnection, Energy accounting and other related activities in Bangarmau Town of Unnao District. |
| 22-CE (LZ)/Works/2010-11 | Part – I 23.11.2010 At 15:00 Hours |
Chief Engineer, (Distribution), Lucknow Zone, MVVNL, Lucknow | Meter reading, bill generation, bill distribution, disconnection, Energy accounting and other related activities in Mallawan, Shahabad & Sandila Town of Hardoi District. |
| MEDCO/427/2010 (Short Term) | 30.10.2010 at. 15:30 Hrs | Chief Engineer (MM) MVVNL, Lucknow | (i) Supply of DLMS Ready LT TVM (Category wise A, C) For R-APDRP (ii) Supply of DLMS Ready HT (11KV & 33 KV) TVM (Category wise A, B, C) For R-APDRP |
| MEDCO/426/2010 | 19.11.2010 Time 15:00 Hrs |
Chief Engineer (MM), MVVNL | Work of Meter checking/testing of consumers having load (1 KW. to 25 KW.) in LESA MVVNL Lucknow area for 12 months period. |
| MEDCO/410/2010 | 15.11.2010 Time 15:00 Hrs |
Executive Engineer | पांच नान ए0सी0 डीजल कार 12 माह हेतु मासिक किराये पर लेने की आवश्यकता है। इसके अतिरिक्त विशेष अवसरोहेतु एम्बेस्डर, इन्नोवा, इंडिगो आदि डीजल वाहनों की आवश्यकता होगी। ड्राइवर सहित। |
| MEDCO/422/2010 | 10.11.2010 At 16:00 Hrs |
Chief Engineer (MM), MVVNL, Lucknow | Supply of Pre-Printed Continuous Computer Stationery |
| 79/E.U.D.C-III/2010-11 | 02.11.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Pin pointing of cable faults locations in the area of E.U.D.C-III,LESA,Lucknow |
| 77/E.U.D.C-III/2010-11 | 30.10.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Bifercation of campbell Road feeder in the area of E.U.D.D-Rajajipuram, LESA, Lucknow |
| 78/E.U.D.C-III/2010-11 | 26.10.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Supply of Rewirable type tinned fuse wire |
| 76/E.U.D.C-III/2010-11 | 23.10.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Increasing capacity from 63 KVA to 250 KVA Sub-Station at Ahiran Khera in the area of E.U.D.D-Aishbagh, LESA, Lucknow |
| (a) MEDCO/424/2010 | 20.10.2010 At 16:00 hrs. |
Chief Engineer (MM), MVVNL, Lucknow |
Supply of Three Phase L.T. Distribution box
suitable for various sizes of Three Phase Arial Bunched Cable |
| (b) Corrigendum For MEDCO/424/2010 | 20.10.2010 At 16:00 hrs. |
Chief Engineer (MM), MVVNL, Lucknow | Supply of Three Phase L.T. Distribution box suitable for various sizes of Three Phase Arial Bunched Cable |
| MEDCO/425/2010 | Date of Pre-Bid conference 21.10.2010 at 15:30 Hrs. Date of Opening of Tender 09.11.2010 at. 15:00 Hrs. | Chief Engineer (MM), MVVNL Lucknow | Work of MRI Based Billing of Consumers (From 25 HP/KW Load to 500 KVA) in LESA, MVVNL, Lucknow for 12 Months Period. |
| 73/E.U.D.C-III/2010-11 | 19.10.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Purchase of material (Brass back Entry & U-type spring contact) |
| MEDCO/419/2010 | 19.10.2010 Time 16:30 Hrs. | Chief Engineer (MM), MVVNL Lucknow | Repair of 11/0.433 KV, 160 KVA, 250 KVA, 400 KVA, 630 KVA, 1000 KVA (& Any other Transformer of assorted rating between 160 to 1000 KVA) Burnt/Damaged Copper Wound Transformers |
| MEDCO/418/2010 | 19.10.2010 Time 15:00 Hrs. | Chief Engineer (MM), MVVNL Lucknow | Repair of 11/0.433 KV, 25KVA, 63 KVA, 100 KVA, 160 KVA, 250 KVA (& Any other Transformer of assorted rating between 25 to 250 KVA) Burnt/Damaged Alumunium Wound Transformers |
| 31/ECD(D)/L/ 10-11 | 15.10.2010 | Executive Engineer | 33/11 के०वी० विद्युत उपकेन्द्र खोराहंसा जनपद गोण्डा के स्विचयार्ड में पाइल फाउण्डेशन का कार्य। |
| 30/ECD(D)/L/ 10-11 | 15.10.2010 | Executive Engineer | 33/11 के०वी० विद्युत उपकेन्द्र मलिहाबाद जनपद लखनऊ पर उपखण्ड अधिकारी के कार्यालय हेतु एक नये कमरें एवं शौचालय का निर्माण एवं विविध जानपदीय कार्य । |
| 29/ECD(D)/L/ 10-11 | 15.10.2010 | Executive Engineer | लेसा क्षेत्र के अन्तर्गत 33/11 के०वी० अलीगंज, सर्वोदय नगर, इन्दिरा नगर, सुभाष पार्क महानगर, न्यू यूनिवर्सिटी सीतापुर रोड लखनऊ पर विद्युत बिलिंग केन्द्र का निर्माण एवं अन्य विविध जानपदीय कार्य। |
| 28/ECD(D)/L/ 10-11 | 15.10.2010 | Executive Engineer | लेसा क्षेत्र के अन्तर्गत 33/11 के०वी० राजाजीपुरम, एशबाग, तालकटोरा एशबाग, सहायक अभियन्ता (मी०) अम्बेडकर नगर यूनिवर्सिटी, सहायक अभियन्ता (मी०) भीखमपुर लखनऊ पर विद्युत बिलिंग केन्द्र का निर्माण एवं अन्य विविध जानपदीय कार्य। |
| 27/ECD(D)/L/ 10-11 | 15.10.2010 | Executive Engineer | लेसा क्षेत्र के अन्तर्गत 33/11 के०वी० ठाकुर गंज, डालीगंज, चैपटिया, कार्यालय सहायक अभियन्ता (मी०) हनुमान सेतु, लखनऊ हेतु विद्युत बिलिंग केन्द्र का निर्माण एवं अन्य विविध जानपदीय कार्य। |
| 26/ECD(D)/L/ 10-11 | 15.10.2010 | Executive Engineer | (अनुसूचित जाति हेतु आरक्षित ) लेसा क्षेत्र के अन्तर्गत 33/11 के०वी० विद्युत उपकेन्द्र राजभवन ,उपकेन्द्र क्लाइड रोड, क्लाइड रोड राजभवन, लेसा भवन रेजीडेन्सी, सहायक अभियन्ता (मी०) रेजीडेन्सी के कार्यालयों पर विद्युत बिलिंग केन्द्र का निर्माण एवं अन्य विविध जानपदीय कार्य। |
| 72/E.U.D.C-III/2010-11 | 15.10.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Hiring of Vehicle for E.U.D.D-Rajajipuram, LESA, Lucknow. |
| 71/E.U.D.C-III/2010-11 | 15.10.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Construction of 11/0.4 K.V. Sub-Station in the area of E.U.D.D-Kanpur Road, LESA, Lucknow. |
| 25/ECD(D)/L/10-11 | 14.10.2010 | Executive Engineer | Regarding the expansion of switch gaire hall at 33/11 KV Electric substation Fatehganj, Lucknow. |
| 24/ECD(D)/L/ 10-11 | 14.10.2010 | Executive Engineer | Work of renovation of Head office at 4-A
Gokhale Marg MVVNL Lucknow. |
| 70/E.U.D.C-III/2010-11 | 12.10.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Construction of 11/0.4 K.V. Sub-Station in the area of E.U.D.D-Rajajipuram, LESA, Lucknow. |
| MEDCO/421/2010 | 11.10.2010 | Chief Engineer (MM), MVVNL Lucknow | L.T. PVC insulated twin core 2.5mm² cable with round Aluminium Conductor black sheathed |
| 47/CE/LESA/WORKS/2010-11 | 07. 10.2010 | Chief Engineer LESA, Lucknow. | Meter Reading, Bill Generation, Bill Distribution, Disconnection/Re-connection,Energy Accounting and other related activities in CESS Division-I/II under the jurisdiction of S.E. EDC-IV, LESA, Lucknow. |
| 68/E.U.D.C-III/2010-11 | 5.10.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Construction of 11/0.4 K.V. Sub-Station in the area of E.U.D.D-Aishbagh, LESA, Lucknow. |
| 69/E.U.D.C-III/2010-11 | 4.10.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Construction of 11/0.4 K.V. Sub-Station in the area of E.U.D.D-Rajajipuram, LESA, Lucknow. |
| 67/E.U.D.C-III/2010-11 | 4.10.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Hiring of Wehicle in the area of E.U.D.D-Kanpur Road, LESA, Lucknow |
| MEDCO/415/2010 Repairs of 33/11 and 37.5/11 KV, 5, 8 and 10 MVA Burnt/ Damaged Power Transformers | 09.09.2010 at 15:00 Hrs | Chief Engineer (MM), MVVNL | Repairs of 33/11 and 37.5/11 KV, 5, 8 and 10 MVA Burnt/ Damaged Power Transformers |
| (a) MEDCO/415/2010 | 30.09.2010 (Corrigendum for extention of date of opening) | C.E. (MM), MVVNL, Lucknow | Repair of 33/11 KV & 37.5/11 KV, 5, 8 and 10 MVA Burnt/Damaged Power Transformers |
| (b) MEDCO/415/2010 | 30.09.2010 Corrigendum for specification no. Medco/415/2010 | Chief Engineer (MM), MVVNL | One amendment in “Special Condition of the Repair Contract” delivery clause 21.1 against Specification No. MEDCO/415/2010 for Repair of 33/11 KV & 37.5/11 KV, 5, 8 and 10 MVA Burnt/ Damaged Power Transformers. |
| Tender No. 38/EUCC (V)/LESA/2010-11 | 25-09-2010 | S.E., E.U.D.C-V, LESA, Lucknow | Laying of underground 33 kV 3X120 sq. mm XLPE cable for releasing connection to Gwari Calvert STP from 220 kV Sub station Maleshimau Gomti nagar, Lucknow |
| Tender No. 37/EUCC (V)/LESA/2010-11 | 24-09-2010 at 14:00 | S.E., E.U.D.C-V, LESA, Lucknow | Laying of underground XLPE cable in place of overhead H.T. & Shifting of L.T. line due to construction of over-bridge on Railway line Sumit Complex, Mithai Chauraha towards Thana Gomtinagar Lucknow |
| Tender No. 36/EUCC (V)/LESA/2010-11 | 24-09-2010 at 14:00 | S.E., E.U.D.C-V, LESA, Lucknow | As per Attachment |
| 66/E.U.D.C-III/2010-11 | 21-09-2010 | S.E., E.U.D.C-III, LESA, Lucknow | Construction of 11/0.4 K.V. Sub-Station in the area of E.U.D.D-Aishbagh, LESA, Lucknow |
| Tender No. 20/2010&11 | 21-09-2010 at 13:00 hrs | Superintending Engineer E-D-C- Sultanpur | As per Attachment |
| ESCL/16/2010 | 16-09-2010 | Office of the Supritending Engineer, Electricity Store Circle, B-21 'H' Road, Mahanagar Extn, Lucknow - 226006 | Procurement of 10 MVA cooper wound power Transformer. . |
| 66/E.U.D.C-III/2010-11 | 21-09-2010 | S.E., E.U.D.C-III, LESA, Lucknow | Construction of 11/0.4 K.V. Sub-Station in the area of E.U.D.D-Aishbagh, LESA, Lucknow |
| 65/E.U.D.C-III/2010-11 | 18-09-2010 | S.E., E.U.D.C-III, LESA, Lucknow | Replacement of damaged Transformer in the area of E.U.D.D-Rajajipuram, LESA, Lucknow |
| 64/E.U.D.C-III/2010-11 | 18-09-2010 | S.E., E.U.D.C-III, LESA, Lucknow | Replacement of damaged Transformer in the area of E.U.D.D-Aishbagh, LESA, Lucknow |
| 63/E.U.D.C-III/2010-11 | 13-09-2010 | S.E., E.U.D.C-III, LESA, Lucknow | Construction of 11/0.4 K.V. Sub-Station |
| 12/ECD(D)/L/ 2010-11 | 04-09-2010 | Executive Engineer | As per Attachment |
| 13/ECD(D)/L/ 2010-11 | 04-09-2010 | Executive Engineer | As per Attachment |
| 14/ECD(D)/L/ 2010-11 | 04-09-2010 | Executive Engineer | As per Attachment |
| 15/ECD(D)/L/ 2010-11 | 04-09-2010 | Executive Engineer | As per Attachment |
| 16/ECD(D)/L/ 2010-11 | 04-09-2010 | Executive Engineer | As per Attachment |
| MEDCO/415/2010 Repairs of 33/11 and 37.5/11 KV, 5, 8 and 10 MVA Burnt/ Damaged Power Transformers | 09.09.2010 at 15:00 Hrs | Chief Engineer (MM), MVVNL | Repairs of 33/11 and 37.5/11 KV, 5, 8 and 10 MVA Burnt/ Damaged Power Transformers |
| 60/E.U.D.C-III/2010-11 | 31.08.2010 | S.E., E.U.D.C-III, LESA, Lucknow | Hiring of Vehicle |
| 61/E.U.D.C-III/2010-11 | 31-08-2010 | S.E., E.U.D.C-III, LESA, Lucknow | Well type Earthing & Fencing in the area of E.U.D.D-Rajajipuram under Business Plan 2010-2011 |
| 25/EUCC (V)/LESA/ 2010-11 | 27.08.2010 | Superintending Engineer, Electricity Urban Construction Circle-V, LESA Bhawan, Residency, Lucknow. | Laying of 33 kV 3x300 sq. mm Double circuit underground XLPE cable from TRT to 33 kV Substation Rajajipuram (I) |
| 25/EUDC(I)/LESA/2010-11 | 26.08.2010 | Superintending Engineer, Electricity Urban Distribution Circle-I, LESA Bhawan, Residency, Lucknow. | For Removal of damaged distribution transformers from the system, its loading-carriage-unloading upto ESC Daliganj/Transformer repair workshop (Aliganj) and healthy/ repaired transformer from ESC Daliganj/Transformer Repair Workshop upto site its erection and commissioning. |
| 24/EUCC (V)/LESA/2010-11 | 25.08.2010 | Superintending Engineer, Electricity Urban Construction Circle-V, LESA Bhawan, Residency, Lucknow. | Repairing of damaged transformers of capacity 25 KVA to 100 KVA in the transformer repair workshop at Aliganj |
| MEDCO/413/2010 Supply of L.T. CTs of Various Ratio | 21.08.2010 at 15:00 Hrs | Chief Engineer (MM), MVVNL | L.T. CTs of Various Ratio |
| ESCL/13/2010 | 20.08.2010 | Office of the Superintending Engineer, Electricity Store Circle, B-21 ‘H’ Road, Mahanagar Extn., Lucknow -226006 | 11/0.433 KV Package Substation with RMU, 400 KVA Transforer & LT Devices. |
| ESCL/14/2010 | 20.08.2010 | Office of the Superintending Engineer, Electricity Store Circle, B-21 ‘H’ Road, Mahanagar Extn., Lucknow -226006 | Procurement of 11/0.433 KV Package Substation with RMU, 750 KVA Transforer & LT Devices. |
| ESCL/15/2010 | 20.08.2010 | Office of the Superintending Engineer, Electricity Store Circle, B-21 ‘H’ Road, Mahanagar Extn., Lucknow -226006 | Procurement of 11/0.433 KV Package Substation with RMU, 990 KVA Transforer & LT Devices. |
| MEDCO/412/2010 | 18.08.2010 | Chief Engineer (MM.), MVVNL, Lucknow. | Meter boxes suitable for various sizes of three phase four wire TVM & MODEM. |
| 09/ECD(D)/L/2010-11 | 12.08.2010 | EE | As per attachment |
| 10/ECD(D)/L/2010-11 | 12.08.2010 | EE | As per attachment |
| 11/ECD(D)/L/2010-11 | 12.08.2010 | EE | As per attachment |
| 06/ECD(D)/L/2010-11 | 06.08.2010 | EE | As per attachment |
| 07/ECD(D)/L/2010-11 | 06.08.2010 | EE | As per attachment |
| 08/ECD(D)/L/2010-11 | 06.08.2010 | EE | As per attachment |
| MEDCO/411/2010 | 02.08.2010 | Chief Engineer (MM.), MVVNL, Lucknow. | Polycorbonate Meter Seals |
| (a) 45/CE/LESA/WORKS/2010-2011 | 16.8.2010 at 16:00 Hrs. | Chief Engineer, LESA, 4-A, Gokhle Marg, Lucknow. | Meter Reading, Bill Generation, Bill Distribution, Disconnection/Reconnection, Energy Accounting and other related activities. |
| (b) Amended specification against tender No. 45/CE/LESA/WORKS/2010-2011 | 16.8.2010 at 16:00 Hrs. | Chief Engineer, LESA, 4-A, Gokhle Marg, Lucknow. | Meter Reading, Bill Generation, Bill Distribution, Disconnection/Reconnection, Energy Accounting and other related activities. |
| (c) 45/CE/LESA/WORKS/2010-2011 (Amendment in Pre-qualifying conditions.) | 14-09-2010 | Chief Engineer , LESA, Lucknow. | Meter Reading, Bill Generation, Bill Distribution, Disconnection, Energy Accounting and other related activities. |
| (d) 45/CE/LESA/WORKS/2010-11 (Amendment in Consortium Clause-3 turn over of pre-qualifying conditions. | 14-09-2010 | Chief Engineer , LESA, Lucknow. | Meter Reading, Bill Generation, Bill Distribution, Disconnection/Re-connection,Energy Accounting and other related activities |
| (a). 44 /CE/LESA/Works/2010-2011 | 12.8.2010 at 4:00 PM | Chief Engineer (MM.) MVVNL 4-A Gokhle Marg, Lucknow | Meter reading, bill generation, bill distribution, disconnection, Energy accounting and other related activities |
| (b.) Amended specification against tender No. 44/CE/LESA/WORKS/2010-11 | 12.08.2010 at 16:00Hrs. | Chief Engineer LESA, Lucknow | Meter Reading, Bill Generation, Bill Distribution, Disconnection, Energy Accounting and other related activities in Distribution Divisions under the jurisdiction of SE EDC-IV LESA, Lucknow |
| MEDCO_408_2010 | 23.07.2010 at. 15:00 Hrs. | Chief Engineer (MM.) MVVNL 4-A Gokhle Marg, Lucknow | MEDCO_408_2010_Pole mounted 33 kv CT-PT Unit |
| MEDCO_407_2010 | 23.07.2010 at. 15:00 Hrs. | Chief Engineer (MM.) MVVNL 4-A Gokhle Marg, Lucknow | MEDCO_407_2010_ Pole mounted 11 kv CT-PT Unit |
| MEDCO_406_2010 | 23.07.2010 at. 15:00 Hrs. | Chief Engineer (MM.) MVVNL 4-A Gokhle Marg, Lucknow | MEDCO_406_2010_33 KV Pilfer Resistant Metering Cubicle |
| MEDCO_405_2010te | 19.07.2010 at. 15:00 Hrs. | Chief Engineer (MM.) MVVNL 4-A Gokhle Marg, Lucknow | MEDCO_405_ 2010_ 11 Kv Pilfer Resistant Metering Cubicle |